MORGAN SINDALL GROUP PLC
2138008339ULDGZRB345 2024-01-01 2024-12-31 2138008339ULDGZRB345 2025-01-01 2025-12-31 2138008339ULDGZRB345 2025-12-31 2138008339ULDGZRB345 2024-12-31 2138008339ULDGZRB345 2023-12-31 2138008339ULDGZRB345 2025-01-01 2025-12-31 ifrs-full:IssuedCapitalMember 2138008339ULDGZRB345 2025-01-01 2025-12-31 ifrs-full:SharePremiumMember 2138008339ULDGZRB345 2025-01-01 2025-12-31 ifrs-full:OtherReservesMember 2138008339ULDGZRB345 2025-01-01 2025-12-31 ifrs-full:RetainedEarningsMember 2138008339ULDGZRB345 2024-01-01 2024-12-31 ifrs-full:IssuedCapitalMember 2138008339ULDGZRB345 2024-01-01 2024-12-31 ifrs-full:SharePremiumMember 2138008339ULDGZRB345 2024-01-01 2024-12-31 ifrs-full:OtherReservesMember 2138008339ULDGZRB345 2024-01-01 2024-12-31 ifrs-full:RetainedEarningsMember 2138008339ULDGZRB345 2024-12-31 ifrs-full:RetainedEarningsMember 2138008339ULDGZRB345 2024-12-31 ifrs-full:OtherReservesMember 2138008339ULDGZRB345 2024-12-31 ifrs-full:SharePremiumMember 2138008339ULDGZRB345 2024-12-31 ifrs-full:IssuedCapitalMember 2138008339ULDGZRB345 2025-12-31 ifrs-full:IssuedCapitalMember 2138008339ULDGZRB345 2025-12-31 ifrs-full:SharePremiumMember 2138008339ULDGZRB345 2025-12-31 ifrs-full:OtherReservesMember 2138008339ULDGZRB345 2025-12-31 ifrs-full:RetainedEarningsMember 2138008339ULDGZRB345 2023-12-31 ifrs-full:RetainedEarningsMember 2138008339ULDGZRB345 2023-12-31 ifrs-full:OtherReservesMember 2138008339ULDGZRB345 2023-12-31 ifrs-full:SharePremiumMember 2138008339ULDGZRB345 2023-12-31 ifrs-full:IssuedCapitalMember iso4217:GBP iso4217:GBP xbrli:shares
Annual Report 2025
For more information visit
morgansindall.com
We are the partnerships, fit out
and construction services group.
Our record performance in 2025 is a result
of the energy and commitment of our
empowered teams, together with our deeply
held Core Values.
Our leadership in sustainability has been
recognised with an ESG rating of AAA from
MSCI
1
and an A– climate rating from CDP.
Strategic report
04
2025 in numbers
05
Chief executive’s
statement
06
Our businesses
07
Market conditions
08
Business model
10
Purpose, values
and strategy
11
Our stakeholders
14
Key performance
indicators
16
Financial review
19
Capital allocation
21
Operating review
34
Responsible business
strategy and performance
47
Managing risk
56
Climate reporting
63
Section 172 statement
64
Non-financial and
sustainability information
statement
66
Going concern and
viability statement
Governance
69
The UK Corporate
Governance Code
71
Chair’s statement
72
Board overview
73
Our Board
75
Governance framework
76
Board review
80
Nomination
committee report
86
Audit committee report
93
Responsible business
committee report
95
Directors’ remuneration
report
121
Other statutory
information
Financial statements
126
Independent auditor’s
report
137
Consolidated financial
statements
173
Company financial
statements
184
Shareholder information
185
Appendix – Carbon
emissions background
and terminology
1
MSCI is a provider of decision support services for the global investment community; its environmental, social and governance (ESG)
ratings are used by the majority of our major shareholders. CDP is a charity that runs the global disclosure system for investors,
companies, cities, states and regions to manage their environmental impacts.
03
Strategic report
Governance
Financial statements
2025 in numbers
Strong operating performance
Revenue
£5,018.6m
(2024: £4,546.2m)
Operating profit (adjusted*)
£225.7m
(2024: £162.6m)
Operating profit
£224.9m
(2024: £162.0m)
Secured workload
£11,972.2m
(2024: £11,419.3m)
Financial strength and shareholder returns
Profit before tax (adjusted*)
£232.6m
(2024: £172.5m)
Profit before tax
£231.8m
(2024: £171.9m)
Average daily net cash
£367.6m
(2024: £374.2m)
Total dividend per share
158p
(2024: 131.5p)
Social and environmental value
Reduction in Scope 1 and 2 carbon emissions since 2019
1
55%
(2024: 44%)
CDP Climate score
A–
(2024: A)
Apprentices, sponsored students
and professional learning
2
1,045
(2024: 1,087)
Lost time
incident rate
3
0.18
(2024: 0.23)
Materiality
Our annual report aims to provide our investors with the information they need to make decisions, for example on whether to buy, hold or sell our shares,
how to vote on their shares and whether to engage with our Board on any issue. We have included information we believe is material to these decisions and
presented it in a way that we believe is fair, balanced and understandable. We recognise that this report will be read by a variety of other stakeholders, including
employees, our supply chain, clients and partners, funders and performance bond issuers, analysts and regulators. Where we believe that a topic is material
to many of them, based on our latest materiality assessment (see page 35), we either include it in this report or refer to other reports and information on our
website. We believe this approach meets the requirements of company law, the UK Corporate Governance Code, the Companies Act 2006 and UK-adopted
international accounting and reporting standards, and that we go beyond these requirements where we feel it is useful for the reader.
*
See note 28 to the consolidated financial statements for alternative performance measure definitions and reconciliations.
1
The 2019 baseline for Scope 1 and 2 emissions was 20,903 tonnes CO
2
e. This figure represents our UK and European operations. See Appendix on page 185
for emission scope definitions.
2
Includes number of apprentices, sponsored students and employees undertaking national vocational and professional qualifications.
3
Number of lost time incidents x 100,000 divided by the number of hours worked. Lost time incidents are those resulting in absence from work for a
minimum of one working day, excluding the day the incident occurred.
Morgan Sindall Group plc
Annual Report 2025
04
Chief executive’s statement
A decade of strong organic
growth delivered through
our decentralised and
empowered businesses
Values- and performance-led culture
Over the last 10 years, we have delivered an 18% CAGR
1
for
adjusted profit before tax. This has been delivered by our
decentralised operating model through each of our five
empowered businesses, based on our vision to harness the
energy of our teams to achieve the improbable. Our performance
is a result of their huge commitment, together with our deeply
held Core Values, as they have responsibly overcome challenges
and taken advantage of opportunities with pace and agility, while
making their businesses even better.
Over the last year, we achieved significant growth in adjusted
profit before tax, up 35% to £233m from the prior year. We also
continued to make significant strategic progress across the wide
number of sectors the Group operates in, entering 2026 with a
record level secured order book and work at preferred bidder
stage up 17% to £19.1bn from the prior year. As a result, the
improved outlook has given us the confidence to increase the
medium-term targets for both the Mixed Use Partnerships and
Infrastructure divisions.
Our balance sheet, which is supported by a substantial average
daily cash position, continues to allow us to focus on making the
right decisions to drive long-term sustainable growth while also
supporting strong returns to shareholders in the year, with the
full-year dividend increasing by 20% to 158p per share.
Our strategy for long-term growth
Our ability to take a long-term view has been underpinned by
the strong organic profitable growth we have enjoyed over the
last decade, achieved through agility and decisions made over
the short term to benefit the long term.
I am pleased to report that, during 2025, Mixed Use Partnerships
converted eight sizeable schemes, previously at preferred bidder
stage, to signed development agreements, followed by the
appointment as preferred developer for eight sizeable new
schemes during the year. Importantly, the division was successful
in securing funding applications for a number of schemes that will
now start on site during 2026.
Despite the private housing market continuing to be subdued,
the Partnership Housing division secured sizeable partnership
schemes during the year, including Cardiff Council, Vale of
Glamorgan Council and Barnet Council to collectively deliver
3,000 homes over the next decade, while also being appointed
as preferred developer by Druids Heath regeneration scheme
with Birmingham City Council to build around 3,500 new homes
over the next two decades.
1
Compound annual growth rate.
Our Total Commitments
Our responsible business strategy continues to enable our
long-term growth ambitions as we prioritise delivering social and
environmental value. In 2025 we retained our MSCI AAA ESG
rating for the fifth consecutive year and achieved an A– for CDP
Climate, while also supporting the development and safeguarding
of our people and partners.
Board changes
I am delighted to welcome Peter Harrison as our new chair,
succeeding Michael Findlay who retired from the Board in
July 2025 after nine years of service. I would like to thank
Michael personally for being such a great, supportive chair.
Our outlook for 2026
Looking ahead, and despite some of the current headwinds in the
housing market, we remain positive for the year ahead and are on
track to deliver an outcome for 2026 which is in line with revised
expectations as set out in our trading update released on
12 February 2026.
John Morgan
Chief Executive
05
Strategic report
Governance
Financial statements
Our businesses
Specialists in our chosen markets
Partnerships
Construction Services
Fit Out
Partnership Housing
Construction
Mixed Use Partnerships
Infrastructure
Fit Out
Revenue
£1,159m
Revenue
£212m
Revenue
£935m
Education, healthcare, commercial, industrial,
leisure and retail markets.
morgansindallconstruction.com
Infrastructure includes the BakerHicks design
activities based out of the UK and Switzerland.
bakerhicks.com
Planned maintenance services for social housing
and the wider public sector.
morgansindallpropertyservices.com
Nuclear, energy, defence, rail, water, highways
and aviation markets.
morgansindallinfrastructure.com
Partnerships with local authorities and
housing associations. Mixed-tenure
developments, building/developing homes
for open market sale and for social/affordable
rent, design and build house contracting,
and limited refurbishment.
lovell.co.uk
Transforming the urban landscape through
partnership working and the development
of large forward-funded multi-phase sites
and mixed-use placemaking.
museplaces.com
Office interior design and build services
direct to occupiers.
morganlovell.co.uk
Revenue
£1,784m
Fit out and refurbishment in commercial,
central and local government offices, as well as
further education.
overbury.com
Revenue
£903m
Revenue
£52m
Morgan Sindall Group plc
Annual Report 2025
06
Market conditions
In Fit Out, business and market changes impacting tenants
continue to be a robust and supportive driver, ranging from more
regular lease events with a resurgence of refurbishments and
retrofit schemes, to prioritising the need for sustainability and
energy efficiency from high-quality offices, together with more
flexible and collaborative workspaces.
In other well-established sectors for the Group, the Spending
Review announced an increase in planned spending
commitments in defence, transport, nuclear, energy and
education, providing several attractive long-term bidding
opportunities for Construction, Infrastructure and
Partnership Housing.
2026 outlook
Looking ahead, and despite some of the current headwinds in
the housing market, we remain positive for 2026 and are on track
to deliver an outcome in line with our revised expectations set out
in our trading update released on 12 February 2026.
The 2026 outlook for each division is detailed in the operating
review on pages 21 to 33.
Despite some of the current
market headwinds, we remain
confident of the strength of the
markets in which we operate
over the medium and long term
The fundamentals for the fit out market continue to remain
favourable, while UK construction and partnership programmes
are expected to benefit from the recent government investment
commitments announced in the June 2025 Spending Review
and subsequent Autumn Budget together with the continued
supportive market environment within the energy infrastructure
sector. These investments are expected to support both
government and regulatory target objectives over the medium
to long term, noting that the pace of delivering against these
commitments will be key.
Elsewhere, following a year of slow housing and apartment sales
activity in the private housing market, a gradual pace of recovery
is expected over the forthcoming year as affordability constraints
are expected to slowly ease with the lowering of interest rates,
while planning reforms progress at a moderate pace.
Against the backdrop of the affordable home targets set out
by the government in 2024, we welcomed the investment
commitments made in the Spending Review to support the
delivery of these targets over the medium term. Of note was the
launch of the National Housing Bank, which includes £16bn of
new public investment to unlock and bring forward large and
complex sites at pace through the provision of infrastructure
finance and guarantees, while also unlocking private investment.
This was followed by an established Affordable Homes
Programme, with the UK government’s commitment to invest
£39bn over 10 years. Importantly, the social housing sector
will also benefit from a 10-year rent settlement that allows
landlords to raise rents by 1% above inflation, providing
housing associations with both medium- and long-term visibility
over revenue and therefore supporting earlier investment
planning decisions.
07
Strategic report
Governance
Financial statements
Business model
Our Group offers a unique range of housing,
mixed-use placemaking, fit out and construction
services to public sector, regulated-industry and
commercial partners and clients.
We operate in specialist markets where there is
strong demand, high barriers to entry and potential
for growth in the medium and long term.
See page 6 for detail on our divisions’ services and markets,
and pages 7 and 21 to 33 for an update on their respective
business environments
For information on how we manage and sustain our resources,
see pages 11 to 13 (our stakeholders); 34 to 46 (responsible business
strategy and performance); 16 to 18 (financial review); 21 to 33
(operating review); and 47 to 55 (managing risk)
A decade of strong organic growth
enabling continued investment
over the medium and long term
Our sources of
competitive advantage
A strong culture
A strong culture underpins our decentralised approach.
Our people are focused on the customer, partner and
end-user experience, as well as the potential impacts of
our activities on the environment and wider society.
Decentralised philosophy
Our businesses are empowered to be innovative,
entrepreneurial, agile and responsive. Each business is a
trusted brand with extensive experience in its field and a
strong track record. The diversity of our offering protects
the Group against the cyclical nature of our markets.
Collaborative relationships with clients and partners
Partnerships with local authorities, housing associations,
landowners and private enterprises to deliver long-term
schemes; long-term client relationships and repeat
business achieved through our commitment to delivering
exceptional projects.
People
The knowledge, skills and experience of talented people
who are passionate about what they do and trusted to
make decisions.
Supply chain partners
A national network of suppliers and subcontractors with
local knowledge. Each division has its own pool of suppliers,
mitigating risk across the Group.
Financial strength
The Group’s strong cash balance enables us to make
sound decisions for its long-term development, while
also enhancing its competitive advantage and future
work-winning.
Sustainable and responsible solutions
Ability to deliver energy-saving, carbon-reducing projects
and buildings.
Morgan Sindall Group plc
Annual Report 2025
08
Business model
continued
Driving organic long-term growth
Value we create
We use cash from our
fit out and construction
services activities to
invest in long-term
housing and mixed-use
schemes delivered
through partnerships.
More detail on investment in our
partnership activities can be found
on page 20.
Transforming the built environment:
New housing, schools and colleges, commercial and critical services infrastructure, mixed-use urban places,
and property services for social housing.
Invests cash for long-term
value and provides
construction opportunities
Generates cash
Generates cash
High-quality
projects
91%
Perfect Delivery
Social value
£1.9bn
as determined by the Social Value
Portal (see page 45 for detail)
Helping our
people succeed
728
promoted internally
Environmental value
55%
reduction in Scope 1 and 2
carbon emissions since 2019
Supporting our
supply chain
98.4%
invoices paid within 60 days
Shareholder returns
158p
total dividend
per share
09
Strategic report
Governance
Financial statements
Harnessing the energy
of our people to achieve
the improbable.
We are a group of complementary
but very different businesses and
every project is unique.
Through our highly decentralised
philosophy, our people have the
responsibility and authority to make
the right decisions at pace.
We encourage our people to think
differently and find better ways of doing
things. This way we can keep exceeding
our stakeholders’ expectations, even as
those expectations increase.
Purpose, values and strategy
Focused on exceeding our
stakeholders’ expectations
Purpose
Values
Strategy
Our Core Values define our
culture and drive our purpose
and strategy.
The energy of our talented teams,
together with our deeply held Core
Values, enables us to exceed
our stakeholders’ expectations.
The customer
comes first
Talented people are
key to our success
Consistent
achievement
requires challenging
the status quo
We act responsibly
to do the right thing
We have a
decentralised
philosophy
See page 79 for how the Board monitors our culture and the degree to which it is embedded
Long-term organic growth for the Group through the exceptional performance of our businesses.
Achieve quality of earnings
by selecting the right projects
aligned to our core strengths
Excel in project delivery
for
our customers and end users
Secure long-term
workstreams,
underpinned
by our teams’ strong and
lasting client and partner
relationships
Deliver on our Total
Commitments to being
a responsible business:
n
protecting people
n
developing people
n
improving the environment
n
working together with our
supply chain
n
enhancing communities
Maintain financial strength,
especially in adverse
economic conditions,
with a strong balance sheet,
significant levels of cash and
attractive dividend policy,
and by investing in
partnership activities to
enable long-term growth
See pages 14 and 15 for our performance against our strategic priorities and pages 48 to 54 for our principal risks
Morgan Sindall Group plc
Annual Report 2025
10
Our stakeholders
Understanding our
stakeholders’ priorities
We develop long-term relationships through close working and communication. The Board
engages directly with our people, shareholders and analysts; our divisions manage their
relationships with their people, supply chain, clients, partners and local communities.
The executive directors are kept informed of the divisions’ stakeholder engagement via
regular divisional board meetings and update the Board as appropriate.
Our people
The passion, expertise and
empowerment of more than
8,500 employees enable us
to achieve the improbable for
our stakeholders.
How the Group engaged
Our divisions undertake a variety of employee
engagement activities which include surveys,
conferences and forums for gathering ideas and
innovations.
Examples of actions taken during the year in direct
response to feedback include the following:
n
Mixed Use Partnerships launched a ‘Great
Things’ engagement inbox and newsletter that
reinforces the division’s values and sense of
community, and is preparing to launch ‘Appraisd’,
a bespoke learning and development portal.
n
Fit Out employees were asking for more one-
on-one time with their line managers and the
division has reinstated annual performance
development plans (PDPs) that will cover
wellbeing as well as career development. Fit Out
will be reviewing its PDP guidance in 2026 to
clarify purpose and expectations.
n
Construction heard from employees that they
wanted continued support with their technical,
management and leadership capabilities. The
division is addressing this through performance
management processes, 360-degree feedback,
coaching/mentoring, and a suite of formal
technical training, early careers and management
and leadership programmes.
How the Board engaged
All non-executive directors, including the
chair, engage with employees as part of our
annual strategy review, through meetings
and site visits. Each non-executive is matched
with a division on an annual rotational basis,
enabling fresh perspectives and insights which
they can share with the Board. Divisional
managing directors and other internal experts
present at Board meetings, and each year the
Board meets informally with representatives
from two divisions.
In 2025, some of our non-executives met
with c.70 employees at our 2025 senior
management conference, which provided
an opportunity for multiple discussions
with employees without their managers or
executive directors present. Jen Tippin, in
her role as remuneration committee chair,
attended a meeting of the Group’s HR
forum to gain a better understanding of any
concerns raised by employees and to discuss
remuneration across the Group.
No issues arose from discussions with
employees in 2025 that impacted the Board’s
principal decisions. The meetings provided
evidence of a culture of openness and
transparency, and confirmed that employees
feel engaged and consider our Core Values
to be a true differentiator for the business.
See pages 36 to 39 for more
information on our engagement
with our people during the year
11
Strategic report
Governance
Financial statements
Our stakeholders
continued
Supply chain
Our national network of
selected suppliers and
subcontractors are aligned
to our values, and we regard
them as strategic, long-term
partners. Our strong
relationships with our supply
chain help us achieve superior
project delivery and can give
us a competitive advantage.
How the Group engaged
We engage through many channels, including
site inductions, toolbox talks and data platforms.
Through these channels we seek to convey
our culture, values and standards and provide
information on upcoming projects, procurement
prospects and other relevant information.
Discussion topics are varied but include safety,
wellbeing and our approach to legal obligations
such as data security and modern slavery. We
offer our supply chain constructive feedback and,
where needed, guidance on performance against
set criteria.
Supply chain engagement events were hosted by
divisions during 2025 to share ideas and strengthen
relationships. The divisions continued to collaborate
with their supply chains to drive carbon reduction.
How the Board engaged
The Board reviews the divisions’ health and
safety statistics and strategies and actions
to prevent modern slavery. The executive
directors are updated on supply chain
relationships, including payment practices,
at their monthly divisional board meetings
and refer any significant issues to the Board,
including how the divisions continue to
support their supply chains to help mitigate
the risk of insolvency.
See pages 43 and 44 for more
information on our engagement
with our supply chain during the year
Clients and partners
Our clients come from the
public, commercial and
regulated sectors and
our partners include local
authorities, landowners
and housing associations.
We also consider the needs
and interests of the end
users of the spaces and
infrastructure we create.
Securing work through
partnerships, frameworks
and repeat business is key to
our organic growth strategy.
How the Group engaged
Regular dialogue with our clients and partners
before and during our projects is essential so that
we can understand and deliver their objectives.
Our decentralised approach means we can tailor
our services and solutions and respond quickly to
clients from different sectors, with different needs.
Partnership Housing stepped in for a client for
whom a number of projects had been affected by
their original contractors going into administration,
leaving developments incomplete or with significant
issues. The division worked with the client to
investigate and resolve the issues while remaining
as close as possible within the client’s budget. The
client described Partnership Housing as “open and
honest in their valuations… they honour what they
say they are going to do.”
Fit Out’s growing international client base was asking
for more effective ways of monitoring the progress
of their projects. The division has expanded its
use of digital tools, such as drone flythroughs, 3D
surveys, timelapse photography and its ProjectPLUS
tool, to help its clients stay connected and involved.
This has improved transparency, strengthened trust
and assisted clients and their consultant teams in
making real-time decisions.
How the Board engaged
Executive directors are kept informed of client
and partner relationships at their monthly
divisional board meetings and update the
Board on matters such as key contracts or
new relationships.
Morgan Sindall Group plc
Annual Report 2025
12
Our stakeholders
continued
Local communities
We aim to create social and
economic value for those who
live or work near our projects.
Local residents are a potential
source of recruits and local
suppliers provide valuable
local knowledge.
How the Group engaged
Dedicated community liaison teams engage
with local residents before and during projects.
We run schemes that offer training, employability
skills and work opportunities and partner with
schools to promote construction as a career option.
We also support local charities and take part in
local charitable events.
Mixed Use Partnerships’ English Cities Fund joint
venture invited students from a local primary
school to contribute ideas for a new park at Manor
Road Quarter in Canning Town. The students’ brief
was to think about how the park could promote
movement and wellbeing, and their input inspired
the inclusion of an outdoor gym and skate park.
The park also features rain gardens, wildlife habitats,
planted terraces and picnic areas.
How the Board engaged
The executive directors are kept informed
of community initiatives at their monthly
divisional board meetings and update the
Board on any matters of interest.
See pages 45 and 46 for more
information on our engagement
with local communities during
the year
Shareholders
Our shareholders provide
funds for investment in
long-term growth. We value
the stewardship of our
institutional investors and
the views of all shareholders
and analysts.
How the Board engaged
We make clear and quantitative statements
about our key performance indicators (KPIs) and
objectives to enable shareholders to understand
the performance of the business. We update them
regularly if these change. The executive directors
deliver live full- and half-year results presentations,
with a video link to enable those unable to attend
in person to take part in a live Q&A. We encourage
shareholders to attend our annual general
meeting (AGM) and vote, and to submit questions
to the directors in advance if they are unable to
attend. The Board receives copies of reports from
Institutional Shareholder Services, the Investment
Association, Glass Lewis and Pensions & Investment
Research Consultants ahead of our AGM each year.
In 2025, our new chair, Peter Harrison, proactively
offered meetings to all major shareholders
and met with any shareholder who requested
a meeting, while our remuneration committee
chair, Jen Tippin, consulted with shareholders on
proposed changes to our remuneration policy
and implementation. See our chair’s statement
on page 71 and directors’ remuneration report
on page 98 for more information.
Our executive directors held 55 meetings
with shareholders during the year, including
discussions around our 2024 performance
and strategy and our 2025 half-year results.
They also hosted a capital markets day in May
and met with an additional 39 shareholders
and potential investors at conferences in the
UK, the US and Germany.
Investors asked to learn more about the
Group’s partnerships activity; our half-year
results presentation included updates
from the respective managing directors
of Partnership Housing and Mixed Use
Partnerships. The half-year results roadshow
and subsequent shareholder meetings
elicited good conversations around our
cash and balance sheet, and shareholders
were supportive of the Group continuing to
maximise investment in organic partnership
activities
.
The executive directors shared
feedback from their meetings with the rest
of the Board.
Funders and performance
bond issuers
Our funders and performance
bond issuers provide us
with access to competitively
priced banking, performance
bonding and debt facilities.
Performance bonds, often
known as surety bonds,
are issued by a third party
to guarantee completion
of a contract.
How the Group engaged
Our chief financial officer and director of tax
and treasury meet regularly with our banks and
performance bond issuers, including following the
full- and half-year results, to update them on the
Group’s performance and discuss any expectations
they may have.
In 2025, we secured the extension of our
committed loan facilities (totalling £180m) from
2027 to 2028 (see page 17 for further detail).
How the Board engaged
The Board receives reports from our chief
financial officer on any updates relating to the
Group’s funding arrangements. The Board
also receives a monthly update on our
bonding facilities.
13
Strategic report
Governance
Financial statements
Continuing to make
strategic progress
Key performance indicators
1
Before exceptional building safety credit of £0.6m (2024: charge of £2.7m). See note 2
of the consolidated financial statements.
2
Return on average capital employed = (adjusted operating profit plus interest from
joint ventures) divided by average capital employed.
3
Target updated on 29 July 2025 from £60m–£85m.
4
Before exceptional building safety charge of £1.7m (2024: credit of £0.1m).
5
Target updated on 29 July 2025 from £1bn.
Partnership Housing operating margin
8%
Medium-term target
Fit Out operating profit
£80m–£100m
Medium-term target
3
Infrastructure operating margin
3.75%–4.25%
Medium-term target
Partnership Housing return on average
capital employed
1,2
(last 12 months)
Up towards
25%
Medium-term target
Construction operating margin
4
3.0%–3.5%
Medium-term target
Infrastructure revenue
In excess of
£1bn
Medium-term target
Mixed Use Partnerships
return on capital employed
2
(last 12 months)
Up towards
25%
Medium-term target
Construction revenue
In excess of
£1.5bn
Medium-term target
5
Targets shown are those in place during 2025. See pages 21 to 33 for commentary on performance and targets going forward
Achieve quality of earnings
4.2%
3.6%
4.7%
23
24
25
£99.0m
£71.8m
£139.9m
23
24
25
3.7%
4.3%
4.0%
23
24
25
11%
12%
10%
23
24
25
3.0%
2.7%
3.2%
23
24
25
£1,047.0m
£886.7m
£935.3m
23
24
25
2%
15%
(4)%
23
24
25
£1,044.1m
£966.6m
£1,159.2m
23
24
25
Morgan Sindall Group plc
Annual Report 2025
14
Key performance indicators
continued
6
Perfect Delivery status is granted to Fit Out, Construction and Infrastructure projects
that clients have confirmed meet all four service criteria specified by the division.
7
Scope 1 and 2 carbon emissions data covers our UK and European operations.
See Appendix on page 185 for emissions scope definitions.
8
Scope 3 carbon emissions data covers our UK and European operations. In 2025,
we rebaselined our 2020 Scope 3 emissions across all relevant categories and restated
our 2024 figure to apply new methodologies, assumptions and data points. Our
previously reported baseline was 1,300,271 tCO
2
e. Our Scope 3 emissions increased by
0.7% between 2024 and 2025. Read more about our methodology on page 185.
9
A training day is a minimum of six hours’ training.
10
Number of lost time incidents x 100,000 divided by number of hours worked. Lost time
incidents result in absence from work for a minimum of one working day, excluding the
day the incident occurred.
11
Within the last six months of the year.
12
In 2025, we onboarded all divisions onto the Social Value Portal (SVP). This is the first year
we have aligned the SVP with our annual reporting cycle, although we have been tracking
our contribution on the platform since October 2023.
See pages 34 to 46 for commentary on performance against our Total Commitments
Excel in project
delivery
Secure long-term
workstreams
Maintain financial
strength
Projects achieving Perfect Delivery
6
The divisions are responsible for driving Perfect
Delivery on their projects. Results are regularly
monitored, reported and reviewed at divisional
board level.
Reduction in Scope 1 and 2 carbon
emissions
7
from 2019 baseline
of 20,903 tonnes CO
2
e
60%
2030 target
Lost time incident rate
10
0.18
2030 target
Workload secured for the next three years
We monitor our secured workload for the
current year and beyond as well as the pipeline
of projects for which we are ‘preferred bidder’
(where we have been verbally awarded the
project but there is no formal contract or letter
of intent in place).
Reduction in Scope 3
carbon emissions
7
from 2020 baseline
of 1,603,880 tonnes CO
2
e
8
42%
2030 target
Percentage of invoices paid within 30 days
11
80%
2030 target
Social value generated in 2025
12
£1.9bn
Social value generated since 2023
£6.5bn
(2024: £4.6bn)
Average daily net cash
Maintaining significant levels of cash gives us
a real competitive advantage. Our cash levels
are monitored on a daily basis.
Number of training days
9
per year per employee
6 days
2030 target
Deliver on our Total Commitments
44%
45%
55%
23
24
25
0.23
0.24
0.18
23
24
25
61.5%
68.8%
70.5%
23
24
25
13% increase
13% increase
24
25
3.2 days
3.2 days
3.9
days
23
24
25
91%
92%
91%
23
24
25
£11,419.3m
£8,920.2m
£11,972.2m
23
24
25
£374.2m
£281.7m
£367.6m
23
24
25
15
Strategic report
Governance
Financial statements
Financial review
The quick read...
n
Adjusted* operating profit up 39%
n
Adjusted* profit before tax up 35%
n
Strong balance sheet supported by significant daily cash
and committed bank loan facilities
n
High-quality order book of £12.0bn, with a further £7.1bn
at preferred bidder stage
n
Total dividend up 20% to 158.0p per share
Kelly Gangotra
Chief Financial Officer
Financial performance
Revenue for the year increased 10% to £5,018.6m (2024:
£4,546.2m), with adjusted* operating profit increasing 39% to
£225.7m (2024: £162.6m). This resulted in an adjusted* operating
margin of 4.5%, an increase of 90 basis points (bps) compared
with the prior year (2024: 3.6%). Reported operating profit was
up 39% to £224.9m (2024: £162.0m). Details on performance
by division are shown on pages 21 to 33.
The net finance income reduced to £6.9m (2024: £9.9m),
as a result of interest rates lowering during the year. Reported
profit before tax was £231.8m, up 35% (2024: £171.9m),
while adjusted* profit before tax was £232.6m, up 35%
(2024: £172.5m). This resulted in an adjusted* profit before
tax margin of 4.6%, an increase of 80bps compared with the
prior year (2024: 3.8%).
The tax charge for the year was £56.9m (2024: £40.2m), which
equated to an effective tax rate of 24.5% and was slightly lower
than the UK statutory rate of 25% (2024: 23.4%), primarily due to
amounts relating to prior-year items. The adjusted* tax charge is
£58.7m (2024: £42.0m), which equated to an effective adjusted
tax rate of 25.2%. Almost all of the Group’s operations and profits
are in the UK, and we maintain an open and constructive working
relationship with HMRC.
Reported basic earnings per share was 372.1p (2024: 281.4p),
while adjusted* earnings per share increased 33% to 370.0p
(2024: 278.8p). The total dividend for the year increased 20% to
158.0p per share (2024: 131.5p).
The Group achieved a
record performance in 2025,
delivered through our
decentralised businesses
supported by our empowered
and high-quality teams
2025
2024
Change
Revenue
£5,018.6m
£4,546.2m
+10%
Operating profit – reported
£224.9m
£162.0m
+39%
Operating profit – adjusted*
£225.7m
£162.6m
+39%
Profit before tax – reported
£231.8m
£171.9m
+35%
Profit before tax – adjusted*
£232.6m
£172.5m
+35%
Basic earnings per share –
reported
372.1p
281.4p
+32%
Earnings per share –
adjusted*
370.0p
278.8p
+33%
Year-end net cash*
£531.2m
£492.4m
+£38.8m
Average daily net cash
£367.6m
£374.2m
–£6.6m
Total dividend per share
158.0p
131.5p
+20%
*
See note 28 to the consolidated financial statements for alternative performance measure
definitions and reconciliations.
Morgan Sindall Group plc
Annual Report 2025
16
Financial review
continued
Financing facilities
During 2025, the Group maintained a total of £180m of available
bank facilities, of which £165m matures in October 2028 and
£15m in June 2028. No drawings on the facilities were made
during the year. The banking facilities are subject to financial
covenants, all of which were met throughout the year.
In the normal course of our business, we arrange for financial
institutions to provide client guarantees (performance bonds) to
provide additional assurance to the clients that the contracted
works will be carried out. We pay a fee and provide a counter-
indemnity to the financial institutions for issuing the bonds.
As of 31 December 2025, contract bonds in issue under
uncommitted facilities covered £290.8m (2024: £194.9m) of our
contract commitments.
Further information on the Group’s capital management strategy
and use of financial instruments is given in note 26 to the
consolidated financial statements.
Tax strategy
The Group’s tax strategy, which is approved by the Board,
is published on our website.
Net cash
Operating cash flow* in the year was an inflow of £195.9m
(2024: inflow of £134.8m), after a net decrease in working capital
of £21.0m (2024: £33.8m net decrease) as the Group continued
to support investments in our partnership activities, which
amounted to £124.6m during the year. Overall, there was a net
cash inflow for the year of £38.8m, resulting in closing net cash
of £531.2m (2024: £492.4m).
The average daily net cash* for the year was £367.6m
(2024: £374.2m), which has continued to provide significant
balance sheet strength while enhancing our competitive
advantage and future work-winning efforts.
0
50
100
150
250
200
300
Operating
profit
1
Non-cash
2
Net capex
and finance
leases
3
Movement
in working
capital
4
Other
5
Operating
cash flow
48.6
(44.4)
(21.0)
(13.0)
195.9
225.7
Operating cash flow*
(£m)
1
Adjusted – before intangible amortisation of £0.4m and exceptional building safety charge of £0.4m.
2
Includes depreciation £35.8m, impairment of property, plant and equipment £3.5m and share option expense £10.8m; less the reversal of impairment of joint ventures £1.2m and share
of underlying net profits of joint ventures £0.3m.
3
Includes repayment of lease liabilities £28.3m, purchases of property, plant and equipment £16.0m, purchases of intangibles £0.6m; less proceeds on disposal of property, plant and
equipment £0.5m.
4
Adjusted – before exceptional building safety debtors increase of £5.9m.
5
Decrease in provisions £16.0m, increase in building safety debtors £5.9m and dividend received from joint ventures £4.7m; less exceptional building safety provision decrease £7.3m and
gain on disposal of property, plant and equipment £0.3m.
*
See note 28 to the consolidated financial statements for alternative performance measure definitions and reconciliations.
17
Strategic report
Governance
Financial statements
Financial review
continued
Net working capital
Net working capital is defined as ‘inventories plus trade and other
receivables (including contract assets), less trade and other
payables (including contract liabilities) adjusted’. The Group’s
negative net working capital (excluding non-cash movements
3
)
reduced by £12.4m to £(104.2)m, as shown below:
2025
£m
2024
£m
Change
£m
Inventories
603.3
476.0
+127.3
Trade and other receivables
1
769.9
664.2
+105.7
Trade and other
payables
2,3
(1,477.4)
(1,256.8)
–220.6
Net working capital
(104.2)
(116.6)
+12.4
1
Adjusted to exclude building safety receivable of £17.5m (2024: £11.6m) and capitalised
arrangement fees and accrued interest receivable of £1.8m (2024: £2.3m).
2
Adjusted to exclude accrued interest payable of £0.4m (2024: £0.5m).
3
Movements in trade and other payables also include the non-cash movements relating
to the unwinding of discounting on land creditors (£2.4m) and other smaller non-cash
movements.
Movements in the net working capital include increased
investment in the Group’s partnership activities, offset by slower
sales activity, particularly the Partnership Housing division.
Paying promptly
Paying our supply chain on time is essential and makes us
attractive to work for, and we aim to pay our suppliers as
promptly as possible. We do not use any supplier finance
arrangements. Our divisions have reported the following data
under the payment practices regulations for the six months to
31 December 2025:
Invoices paid within 60 days
2025
%
2024
%
Partnership Housing
98
96
Mixed Use Partnerships
97
97
Fit Out
98
98
Construction and Infrastructure
1
98
98
Property Services
99
99
1
The Construction and Infrastructure divisions form a single legal entity for which this data
is reported.
Provisions
In the year, Group provisions reduced by £16.1m to £89.4m,
of which £56.9m relates to the building safety provisions
(excluding provisions relating to joint ventures).
Secured workload
The Group’s secured workload
1
at 31 December 2025 was
£11,972.2m, an increase of 5% on the prior year end (2024:
£11,419.3m). The divisional split is shown below:
2025
£m
2024
£m
Change
%
Partnership Housing
2,330.2
2,174.0
+7%
Mixed Use Partnerships
4,614.6
4,084.9
+13%
Fit Out
1,311.7
1,438.9
–9%
Construction
1,112.2
951.8
+17%
Property Services
714.4
887.1
–20%
Infrastructure
1,889.9
1,883.1
–
Inter-divisional orders
(0.8)
(0.5)
–
Total
11,972.2
11,419.3
+5%
1
The secured workload is the sum of the committed order book, the framework order
book and (for the partnership divisions only) the Group’s share of the gross development
value of secured schemes (including the development value of open market housing
schemes). The committed order book represents the Group’s share of future revenue
that will be derived from signed contracts or binding letters of intent. The framework order
book represents the Group’s expected share of revenue from the frameworks on which
we have been appointed. This excludes prospects where confirmation has been received
as preferred bidder only, with no formal contract or binding letter of intent in place.
Kelly Gangotra
Chief Financial Officer
Morgan Sindall Group plc
Annual Report 2025
18
Capital allocation
We are committed to
maintaining a strong balance
sheet and holding significant
cash balances at all times
The quick read...
n
Our capital allocation framework is based on a hierarchy
of priorities
n
A strong balance sheet enhances our competitive
advantage and future work-winning, while also providing
a buffer against any economic downturn
n
Investment in our partnership activities, within capital-
efficient structures, to accelerate organic expansion
remains a strategic priority
n
Our dividend cover is expected to be 2.0x–2.5x
n
Bolt-on acquisitions, primarily in Partnership Housing,
will be considered if they complement our existing
growth strategy
The Board’s single, overarching principle governing capital
allocation is a commitment to maintain a strong balance
sheet and to hold significant net cash balances at all times.
This will provide a stable and firm foundation for the Group to
make sound decisions for our long-term development, thereby
enhancing our competitive advantage and future work-winning.
As stated in the financial review on pages 16 and 17, our net cash
at 31 December 2025 was £531m (2024: £492m) and the average
daily net cash for the year was £368m (2024: £374m). The
year-end cash position included £37m held in jointly controlled
operations or held for future payment to designated suppliers.
Over the course of 2025, the lowest net cash balance on any one
day in the year was £270m (2024: £293m). Of this, £43m was held
in jointly controlled operations or held for future payment to
designated suppliers. The Board uses this net cash balance
on the lowest day of the year as the initial reference point from
which it then considers its application of its capital allocation
hierarchy. This allows it to balance the needs of all stakeholders
while enhancing the Group’s market competitiveness and
capabilities and maintaining our financial strength.
Our capital allocation hierarchy is set out below.
A. Maintaining a strong balance sheet
(i) to enhance our competitive
advantage and win future work
Fundamental to our organic growth strategy is engaging
in long-term partnerships with our public and private
sector clients, whether through joint ventures or other
arrangements in our partnership activities, or through
frameworks in construction services activities.
When assessing the suitability of long-term partners,
potential clients across our entire business portfolio are
increasingly looking for security and assurance of long-term
solvency and the availability of cash resources to ensure their
partners can fulfil their long-term contractual obligations.
We consider a strong balance sheet and significant levels
of net cash to be a key market differentiator and a
competitive advantage when bidding for and winning work
to support the future growth of the business.
(ii) to ensure downside protection –
maintaining a ‘buffer’ in the
event of a macro downturn
Maintaining significant levels of net cash is considered as key
to offsetting any potential consequence of a future downturn
in the economy and reduction in revenue in the activities of
Fit Out and our construction services divisions.
These activities operate with a negative working capital
model, which in turn can lead to cash outflows in the event of
declines in revenue. Maintaining a net cash ‘buffer’ therefore
allows us to continue with our strategy of disciplined contract
selectivity and prudent approach to risk management
throughout the whole economic cycle.
19
Strategic report
Governance
Financial statements
B. Maximising investment in our partnership
activities to drive sustainable growth
D. Investment by acquisition to
accelerate sustainable growth
E. Special returns to shareholders
C. Ordinary returns to shareholders
Significant opportunities are expected to arise through the
medium and long term to invest in the existing partnership
businesses to support and accelerate the organic growth
of their activities, which remains a strategic priority:
n
For Partnership Housing, the growth potential remains
substantial despite the market headwinds experienced
over the last 12 to 24 months. The medium-term target
is for an operating margin of 8% and for return on
capital to be up towards 25% on an annual basis. The
capital employed has increased significantly over the
last five years, up from an average of £150.9m in 2020
to an average of £445.7m in 2025. The scalability of the
partnership housing model provides the potential to
further increase the capital employed above current levels
over the medium term.
n
In Mixed Use Partnerships, longer-term development
activities across multi-phase sites and placemaking are
targeted to generate return on capital up towards 30%
on an annual basis over the medium term. The capital
employed in this division is expected to be less capital-
intensive relative to Partnership Housing. In 2025, the
division’s average capital employed was £125.1m. Further,
a more capital-efficient structure is expected from Mixed
Use Partnerships’ current secured development order
book, as well as those at preferred bidder stage, together
with its identified pipeline of future opportunities. As a
result, the capital employed in the division is expected to
increase modestly over the medium term.
Any acquisition activity will likely be targeted towards
our partnership activities, primarily Partnership Housing.
The focus would be on opportunities to complement our
existing organic growth strategy by acquiring pre-existing
partnership development schemes, land options, positions
in existing schemes from third parties or businesses which
can complement or reinforce the division’s position in the
partnerships sector.
Other potential acquisition opportunities across our
construction and fit out activities would only be considered
where they would accelerate growth through the existing
divisional structure and capabilities.
The Board will continue to assess the needs of the business
and the optimum balance sheet structure within the context
of our overarching principle governing capital allocation and
the hierarchy A–D as described above. Any capital then
deemed surplus to these requirements may be returned
to shareholders.
Such returns would be in the form of either share buybacks
or special dividends, with the method of distribution to be
determined by the Board at the time based on prevailing
conditions.
Ordinary dividends are an important component of
shareholder returns. The Board has previously formally
adopted a dividend policy such that dividend cover is
expected to be in the range of 2.0x–2.5x on an annual basis.
Capital allocation
continued
Morgan Sindall Group plc
Annual Report 2025
20
Operating review
Partnership Housing
1
Before exceptional building safety credit of £0.6m (2024: charge of £2.7m). See note 2 of the consolidated financial statements.
2
Capital employed is calculated as total assets (excluding goodwill, intangibles and cash) less total liabilities (excluding exceptional building safety provisions, corporation tax, deferred tax,
inter-company financing and overdrafts).
3
Return on average capital employed = (adjusted operating profit plus interest from joint ventures) divided by average capital employed.
We have delivered a strong and resilient performance
despite slow levels of activity in the housing market.
We have also continued to grow our long-term
partnerships with the public sector through the award
of a number of large strategic schemes.
Steve Coleby
Managing Director
Revenue
(£m)
+5%
Capital employed
1,2
at year end
(£m)
+£133.2m
Average capital employed
1,2
(last 12 months)
(£m)
+£107.9m
Operating margin
(%)
+50bps
Operating profit
1
(£m)
+16%
Return on capital employed
1,3
(last 12 months) (%)
£861.2m
£837.5m
£903.1m
23
24
25
£318.7m
£234.4m
£451.9m
23
24
25
£337.8m
£254.5m
£445.7m
23
24
25
4.2%
3.6%
4.7%
23
24
25
£36.1m
£30.5m
£42.0m
23
24
25
11%
12%
10%
23
24
25
Throughout the year, challenging market conditions continued
to impact the private housing market as consumer confidence
continued to be adversely affected. Notwithstanding this, the
division delivered a resilient and strong performance as it
continued to invest and grow its long-term partnerships with local
authorities and housing associations with momentum. Notable
appointments in the year included being preferred developer on
the Druids Heath regeneration scheme with Birmingham City
Council to build around 3,500 new homes over the next two
decades, and progression of partnership agreements with Barnet
Council and Cardiff Council and Vale of Glamorgan Council to
deliver 3,000 new homes over the next 10 years.
The quick read...
n
Strategy to invest in long-term partnerships with the
public sector has been underpinned by growth in the
secured order book and preferred bidder work
n
Demand for contracting activities with the public sector
has remained strong
n
Stronger margins achieved in both mixed-tenure and
contracting activities
n
Solid profit growth expected in 2026
21
Strategic report
Governance
Financial statements
Operating review
continued
Partnership Housing
Mixed tenure
Good progress was made with the strategy of increasing the
number and size of mixed-tenure sites. At the year end, the
division had 70 active mixed-tenure sites at various stages of
construction and sales, up from 66 at the prior year end, with an
average of 172 open market units per site (up from 166 at the
prior year end). Average site duration is 55 months, providing
long-term visibility of activity.
During the year, 1,531 units were completed across open market
sales and social housing (including through joint ventures)
compared with 1,808 units in 2024, noting that the number
of open market sales within this declined by 10% to 785.
Encouragingly, the average sales price increased by 11% to
£262k (2024: £237k) due to the geographical and product type
mix profile.
Of the total divisional order book, the amount relating to
mixed-tenure activities increased by 18% to £1,541m (2024:
£1,310m). In addition, the amount of mixed-tenure business at
preferred bidder stage, or already under development agreement
but where land has not been drawn down, was £1,283m at the
year end (2024: £1,200m).
Notable work won in the year included a 2,500-home,
27-development partnership with Cardiff and Vale of Glamorgan
Councils, 500 homes with Barnet Council for phase 1 of their
Grahame Park estate, and an 820-home scheme in Barnstaple
in partnership with LiveWest. Preferred developer status was
awarded by Birmingham City Council, to partner with them on
the 3,500-home development in Druids Heath, and by North
Yorkshire Council as their development partner for over 800
homes across North Yorkshire. In addition, Partnership Housing
was appointed master developer for a 1,000-home development
in Barnsley West.
Our strategy in action
Sustainable urban living and
long-term community value
Partnership Housing, with Tirion Homes and the Welsh government,
transformed a major brownfield site at Royal Victoria Court, Newport into
a modern residential community. Previous attempts to regenerate the site
had stalled and the Welsh government facilitated a partnership approach
to take it forward.
Of the 528 new homes, 234 were affordable for rent through Tirion and
30 available for low-cost home ownership through local registered social
landlord, Hedyn; 119 of the 264 open market homes were sold through
the Help to Buy Wales scheme. The development included an eco park,
providing green space while absorbing excess rainwater, reducing flood
risk, providing natural habitats and enhancing biodiversity.
Off-site construction, such as energy-efficient closed panel timber frames
for the 214 apartments, sped up the delivery of the much-needed new
homes. The £100m development achieved an average build rate of
13 homes per month and created over 850 new jobs for local people.
264
new affordable and low-cost homes
Demand for contracting with the public sector has remained
strong, shielding the impact from lower open market sales activity
within the mixed-tenure activities, where the division has been
successful in optimising construction of the contracted affordable
homes on mixed-tenure sites to maintain activity.
For the year, revenue was up 5% to £903m (2024: £861m),
driven by contracting which was up 13% to £638m (71% of
divisional total) compared with the prior year. Mixed-tenure
revenue declined by 11% to £265m (29% of divisional total)
compared with the prior year.
Despite the revenue mix profile, both contracting and mixed-
tenure activities achieved stronger margins over the year, led by
the contract type and the mix of development schemes delivered,
resulting in operating profit increasing by 16% to £42.0m (2024:
£36.1m) with an operating margin of 4.7% (2024: 4.2%).
As the business continued with its strategy to optimise investment
in partnership opportunities for future growth, capital invested in
housing and apartment products launched in the London market
over the course of the year has been impacted by slower sales
activity as a result of low consumer sentiment affected by ongoing
affordability constraints. Reflective of both factors, the average
capital employed for the last 12-month period increased by
£107.9m to £445.7m (2024: £337.8m). The capital employed at
the end of the year was £451.9m, an increase of £133.2m on the
prior year (2024: £318.7m). As a result of the higher average
capital employed, the overall return on capital employed for the
last 12-month period reduced slightly to 10% (2024: 11%).
The division continues to maintain a high-quality secured order
book, through ongoing successful client engagement leading to
work being awarded through two-stage tenders, frameworks or
direct negotiation. The secured order book at the year end was
£2,330m, 7% higher than the prior year end (2024: £2,174m) and,
with 60% of its total value for 2027 and beyond, providing
long-term visibility of workload.
Morgan Sindall Group plc
Annual Report 2025
22
During the year, the division’s existing partnership with Suffolk
County Council achieved a key milestone by commencing its first
project in Newmarket, while the first two sales outlets opened
from its partnership with West Sussex County Council. Elsewhere,
good progress continued to be made on other mixed-tenure
schemes, in partnerships with Abri, Clarion Housing, Flagship
Housing, L&Q, Repton Property Developments (owned by Norfolk
County Council), Riverside Group, the Borough Council of King’s
Lynn & West Norfolk, Together Housing Group, Peabody, Pobl
Group, and Homes England.
Contracting
The division continued to experience robust levels of demand
with clients awarding work either through frameworks or direct
negotiation. The total number of equivalent units built increased
by 12% to 3,687, up from 3,299 in the prior year. Of the total
divisional order book, the contracting secured order book
declined by 9% to £789m (2024: £863m), of which c.40% is for
2026 and beyond – noting that £1,482m of contracting work was
at preferred bidder stage, providing confidence of a sizeable
ongoing workload for the forthcoming periods.
Key contracting schemes awarded included a c.£50m scheme
with Guinness Homes in Southend; an £18m scheme with
EMH Group to build phase 2 at Standard Hill in Leicestershire;
the £51m phase 7 at Perrybrook, Gloucester with Platform
Housing Group; a £31m Extra Care scheme in Norfolk for
Saffron Housing Trust; a £19m follow-on phase at Barne Barton,
Plymouth for Clarion Housing; the £12m Crick Road phase 3
for Monmouthshire County Council; a £10m development for
Thirteen Group near Spencerbeck Farm in Ormsby; and a £21m
refurbishment contract at Hospital Close for Leicester City
Council. The division is also preferred bidder for phase 1 of a
scheme in Thanet for Riverside, valued at around £70m.
Divisional outlook
Partnership Housing’s medium-term targets are to generate
a return on average capital employed up towards 25% and
to deliver an operating margin of 8%.
Looking ahead to 2026, we remain thoughtful over the pace of
demand recovery with regard to open market sales and expect
the return of consumer confidence to be gradual. Solid profit
growth is expected in the year, while the return on average capital
employed is expected to be in line with 2025 levels, reflecting a
modest return of demand while we continue to invest.
We continue to remain confident over the medium-term
fundamentals of the sector and well positioned to support the
government’s affordable home plans across the country over the
forthcoming years.
The average capital employed is expected to increase up towards
c.£490m to £550m, reflecting the increased scale of the business
and the stage of its developments.
Operating review
continued
Partnership Housing
23
Strategic report
Governance
Financial statements
Operating review
continued
Mixed Use Partnerships
We made significant progress in the year through
expensed investment in schemes starting on site in
2026, and by securing new long-term development
agreements to deliver placemaking in the future.
Phil Mayall
Managing Director
The quick read...
n
Operating performance impacted by costs invested in
schemes planned to start on site in 2026
n
Successful conversion of eight preferred bidder schemes
into partnership agreements
n
Medium-term target for return on capital upgraded to
30% from 2026
As expected, in the year Mixed Use Partnerships reported a loss,
which included increased investment expenditure in schemes
yet to start on site and in schemes which represent future
opportunities for the division. Notwithstanding this, the division
generated profits from a land sale at Basford in Crewe, as well as
profits from schemes on site including offices for the Ministry of
Defence in Blackpool, the Willohaus and C2 buildings in Salford,
Stroudley Walk, and a travel hub in Prestwich.
Importantly, the division continued to build on its prior-year
successes by converting eight schemes previously at preferred
bidder stage to signed development agreements, with six sizeable
schemes at preferred bidder stage at the end of 2025.
Capital invested in a London scheme which launched its
apartment products during 2025 into a weak London market
impacted returns for the division due to low consumer sentiment
affected by ongoing affordability constraints. Reflective of this
and the trading performance during the year, the return on
capital employed for the last 12 months was significantly down
on the prior year, based on average capital employed of £125.1m.
1
Before exceptional building safety credit of £0.6m (2024: credit of £5.9m). See note 2 of the consolidated financial statements.
2
Capital employed is calculated as total assets (excluding goodwill, intangibles and cash) less total liabilities (excluding exceptional building safety provisions, corporation tax, deferred tax,
inter-company financing and overdrafts).
3
Return on average capital employed = (adjusted operating profit plus interest from joint ventures) divided by average capital employed.
Revenue
(£m)
Capital employed
2
at year end
(£m)
+£57.2m
Average capital employed
2
(last 12 months)
(£m)
+£38.2m
Operating profit
1
(£m)
Return on capital employed
3
(last 12 months)
(%)
£90.5m
£185.3m
£51.6m
23
24
25
£94.4m
£79.7m
£151.6m
23
24
25
£86.9m
£98.6m
£125.1m
23
24
25
£1.5m
£14.8m
£(5.3)m
23
24
25
2%
15%
(4)%
23
24
25
Morgan Sindall Group plc
Annual Report 2025
24
At the end of the year, the division’s order book amounted to
£4,615m, 13% ahead of the prior year end (2024: £4,085m),
reflecting the success the division has had in converting a number
of preferred bidder schemes into new and secured long-term
partnership agreements. These include agreements with:
n
Wakefield Council, to accelerate delivery of the city’s
regeneration plans;
n
West Northamptonshire Council, for the regeneration of
Greyfriars in Northampton through ECF, the division’s joint
venture with Homes England and Legal & General;
n
Hull City Council, for the 850-home East Bank Urban Village,
also through ECF;
n
Wythenshawe Community Housing Group and Manchester City
Council, to advance delivery of the first phases of new homes in
Wythenshawe town centre;
n
Stevenage Borough Council, to develop a masterplan and vision
for Station Gateway in Stevenage, through ECF;
n
Durham County Council, to deliver the first phase of the
Durham Innovation District at Aykley Heads; and
n
Salford City Council, to regenerate Eccles town centre.
In the second half of the year, the division was selected as
preferred bidder by Bristol Temple Quarter LLP for Temple
Meads West and St Philip’s Marsh; and by Gateshead Council for
the regeneration of the Baltic Quarter, through ECF. Since the
year end, also through ECF, the division was appointed by
Westmorland and Furness Council as strategic development
partner for Marina Village, Barrow.
During the year, as part of the mixed-use regeneration scheme
at Talbot Gateway in Blackpool, the division completed a
215,000 sq ft workplace for the Department for Work and
Pensions and began construction on a 53,000 sq ft workplace for
the Ministry of Defence. Construction also started on a four-storey
travel hub as part of the first phase of the Prestwich Village
regeneration; and infrastructure works began at Weston M6,
a commercial and business park in Crewe designed to prioritise
the health and wellbeing of employees and visitors.
Progress continued across other active schemes, including two
in Salford through ECF: C2, a residential building containing 196
build-to-rent homes, and Willohaus, an affordable Passivhaus
apartment building. At Stroudley Walk in Bromley-by-Bow, the first
phase of affordable homes was handed over.
The ECF partnership secured planning approval for a number
of developments, including the first phase of the St Helens town
centre regeneration; Stockport 8, a ‘walkable neighbourhood’ with
green space and leisure facilities; a world-leading acoustics facility
as part of the Crescent Salford masterplan; and Smithgate, a new
city centre neighbourhood in Wolverhampton. Working with local
authority partners, the division also secured planning approval
for the regeneration of Oldham town centre, a new culture hub
in Wythenshawe and 244 affordable homes in Horsham. ECF
submitted planning applications during the year for a new city
centre neighbourhood in Bradford and 185 new homes as part
of Crescent Salford. Planning applications were submitted by
Mixed Use Partnerships for Slough’s North West Quadrant and
Mell Square in Solihull.
Mixed Use Partnership’s Habiko partnership with Pension
Insurance Corporation and Homes England announced its first
two sites, Chester and Warrington, for the delivery of 590 new
affordable, sustainable homes.
The division’s development portfolio included seven projects on site at
the end of the year, totalling £205m gross development value (GDV),
with a further 17 planned to start in 2026 with a GDV of £448m.
Divisional outlook
Given the Board’s increased confidence in the long-term prospects
for this division, the medium-term target for Mixed Use Partnerships
has been increased to generate a return on capital up towards 30%.
While the division has experienced a substantial increase in its
development order book for a number of long-term sizeable
schemes over the last two years, profits (and the resulting return
on capital employed) in 2026 are expected to be modest as the
division prioritises the number of schemes starting on site. The
average capital employed for the year is expected to be between
c.£125m and £140m.
Operating review
continued
Mixed Use Partnerships
Our strategy in action
Contributing towards
London’s affordable housing targets
Mixed Use Partnerships reached the first milestone at Stroudley Walk
in Bromley-by-Bow, London with the completion of 82 affordable homes
for rent.
The new mixed-use neighbourhood is being delivered in partnership
with Poplar HARCA, the Greater London Authority (GLA) and the London
Borough of Tower Hamlets. Once complete, the development will provide
a total of 274 homes (115 affordable), a reimagined high street with shops
and civic spaces, a new pocket park and part-pedestrianised public space,
and community spaces including a café and community kitchen.
A proportion of the new homes include sensory-friendly features to help
provide a calm and comfortable environment, in response to an identified
local housing need.
The new homes at Stroudley Walk will make a valuable contribution
towards the GLA’s housing delivery targets, and support the mayor’s vision
for accessible, high-quality housing across London.
25
Strategic report
Governance
Financial statements